Back
Dismantling of the tunneling shield with two cranes
On Michurinsky prospect during the construction of the subway, our cranes dismantled the tunneling shield with the help of two cranes.Crawler crane 750 tons - Liebherr LTM 1750 and truck crane Sany 250 tons.
Other works