back

Back

Dismantling of the tunneling shield with two cranes

On Michurinsky prospect during the construction of the subway, our cranes dismantled the tunneling shield with the help of two cranes.Crawler crane 750 tons - Liebherr LTM 1750 and truck crane Sany 250 tons.

/assets/images/resources/307/shitprev2.jpg /assets/images/resources/307/shitprev1.jpg
Other works
Dismantling and transportation of Efes brewery barrels
Dismantling and transportation of Efes brewery barrels
  • Project Location:

    Moscow
Read More
Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River
Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River
  • Project Location:

    Moscow
Read More
Overpass in Lublino
Overpass in Lublino
  • Project Location:

    Moscow
Read More
Contact us