Groskran is successfully implementing a large-scale project to build a wind power plant (WPP) in the Samara Region, using powerful crawler and truck cranes — Zoomlion ZCC 9800 (800 tons) and Liebherr LTM 1220 (220 tons). These machines play a key role in the installation of heavy structures, including towers, nacelles and wind turbine blades.
Groskran is successfully implementing a large-scale project to build a wind power plant (WPP) in the Samara Region, using powerful crawler and truck cranes — Zoomlion ZCC 9800 (800 tons) and Liebherr LTM 1220 (220 tons). These machines play a key role in the installation of heavy structures, including towers, nacelles and wind turbine blades.
Zoomlion ZCC 9800 — power and stability
The Zoomlion ZCC 9800 crawler crane with a lifting capacity of 800 tons ensures reliability when working with the heaviest elements of the WPP. Its key advantages:
High lifting capacity — ideal for installing towers and nacelles.
Liebherr LTM 1220 – mobility and precision
The Liebherr LTM 1220 truck crane (220 tons) is used for the rapid movement and installation of lighter structures, such as tower sections and wind farm infrastructure elements. Its features:
WPP construction – contribution of Groskran
Groskran ensures the smooth operation of crane equipment, observing strict safety and efficiency standards. The use of Zoomlion ZCC 9800 and Liebherr LTM 1220 allows accelerating the construction of a wind farm, which contributes to the development of green energy in the Samara region.
Thanks to the combination of power, mobility and professionalism of the Groskran team, the wind farm construction project is being implemented within the established deadlines with the highest quality of work.