back

Back

Assembly of a part of the yacht

Coordinated work of the crane operators and high professionalism allowed to move the necessary structures carefully and in a short time.

The Kolomna Shipyard in Moscow required the help of loading equipment for assembly of a part of a yacht weighing 25 tons. LTM1050, LTF1030 cranes were used for the work.

/assets/images/resources/188/izobrazhenie-video-099.jpg /assets/images/resources/188/izobrazhenie-video-100.jpg /assets/images/resources/188/izobrazhenie-video-101.jpg /assets/images/resources/188/izobrazhenie-video-102.jpg /assets/images/resources/188/izobrazhenie-video-103.jpg /assets/images/resources/188/izobrazhenie-video-104.jpg /assets/images/resources/188/izobrazhenie-video-105.jpg /assets/images/resources/188/izobrazhenie-video-106.jpg /assets/images/resources/188/izobrazhenie-video-107.jpg /assets/images/resources/188/izobrazhenie-video-108.jpg /assets/images/resources/188/izobrazhenie-video-109.jpg /assets/images/resources/188/izobrazhenie-video-110.jpg /assets/images/resources/188/izobrazhenie-video-111.jpg
Other works
Dismantling and transportation of Efes brewery barrels
Dismantling and transportation of Efes brewery barrels
  • Project Location:

    Moscow
Read More
Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River
Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River
  • Project Location:

    Moscow
Read More
Overpass in Lublino
Overpass in Lublino
  • Project Location:

    Moscow
Read More
Contact us