Thanks to the fast and well-coordinated work of the specialists, the girders were installed accurately and in a short time.
Back
Installation of bridge girders
Installation of bridge girders in the town of Efremovo, Tula region. Conducted by order of Pereprava. LTM1500 machinery was used for the work, the weight of each girder was 60 tons.
Other works