Thanks to the coordinated work of the crane operators, it was possible to install the elevated pedestrian bridge much faster than planned.
Back
Overpass in Lublino
For this work our company rented two cranes Liebherr LTM1500 (500t) to install on the supports of an elevated crossing of non-standard shape. The structure was assembled at a distance from the supports (about 200m), which is why two units of our equipment were needed.