Project geography

All projects

/

  • All
Special equipment of the company

Special equipment of the company "Groskran" at the construction of the metro in Nizhny Novgorod

  • Project location:

    Nizhny Novgorod Oblast
GROSKRAN's ZOOMLION ZCC 9800 crawler crane is involved in the construction of a waste energy recovery plant in the Moscow region

GROSKRAN's ZOOMLION ZCC 9800 crawler crane is involved in the construction of a waste energy recovery plant in the Moscow region

  • Project location:

    Moscow Region
Operation of Liebherr LTM 1055 and Liebherr HS 855 HD truck cranes at Moscow's Kapotnya Refinery for the Gazprom Company

Operation of Liebherr LTM 1055 and Liebherr HS 855 HD truck cranes at Moscow's Kapotnya Refinery for the Gazprom Company

  • Project location:

    Moscow
Groskran performs works at the plant in Kolomna using Liebherr LTM 1750 and Liebherr LTM 1350 truck cranes

Groskran performs works at the plant in Kolomna using Liebherr LTM 1750 and Liebherr LTM 1350 truck cranes

  • Project location:

    Moscow Region
Works on the construction of the Baltic Chemical Complex in Ust-Luga.

Works on the construction of the Baltic Chemical Complex in Ust-Luga.

  • Project location:

    Leningrad Oblast
A Liebherr LR 1350 crawler crane from Groskran working on the installation of a pedestrian bridge in Serpukhov over the railroad line

A Liebherr LR 1350 crawler crane from Groskran working on the installation of a pedestrian bridge in Serpukhov over the railroad line

  • Project location:

    Moscow Region
Participation of Groskran in the construction of the national stadium in Belarus, Minsk. Minsk

Participation of Groskran in the construction of the national stadium in Belarus, Minsk. Minsk

  • Project location:

    Belarus
Work of Liebherr LTM 1750 truck crane of Groskran in Lobnya: installation of the span structure of the overpass over the railroad line

Work of Liebherr LTM 1750 truck crane of Groskran in Lobnya: installation of the span structure of the overpass over the railroad line

  • Project location:

    Moscow Region
Work of Sany SCC 2500 crawler crane in Dixon for Rosneft Company

Work of Sany SCC 2500 crawler crane in Dixon for Rosneft Company

  • Project location:

    Krasnodar Krai
Operation of Liebherr LTM 1055 truck crane by Groskran on Red Square

Operation of Liebherr LTM 1055 truck crane by Groskran on Red Square

  • Project location:

    Moscow
Operation of Liebherr LTR 1100 crawler crane by Groskran at Sheremetyevo Airport

Operation of Liebherr LTR 1100 crawler crane by Groskran at Sheremetyevo Airport

  • Project location:

    Moscow
Operation of Liebherr LR 1350 crawler crane by Groskran during the reconstruction of Moskvich stadium

Operation of Liebherr LR 1350 crawler crane by Groskran during the reconstruction of Moskvich stadium

  • Project location:

    Moscow
Construction of the tallest residential skyscraper in Moscow “Dow House”

Construction of the tallest residential skyscraper in Moscow “Dow House”

  • Project location:

    Moscow
Installation of high-tech equipment at the Air liquide Severstal project

Installation of high-tech equipment at the Air liquide Severstal project

  • Project location:

    Volgograd Oblast
Groskran successfully completed the installation of the bridge over Savelkinsky Proyezd

Groskran successfully completed the installation of the bridge over Savelkinsky Proyezd

  • Project location:

    Moscow
Construction progress of the Rublevo-Arkhangelskaya line of the Moscow Metro

Construction progress of the Rublevo-Arkhangelskaya line of the Moscow Metro

  • Project location:

    Moscow
Installation of bridge girders in the Moscow region with the help of 750 tons Liebherr LTM 1750 truck crane and trawl

Installation of bridge girders in the Moscow region with the help of 750 tons Liebherr LTM 1750 truck crane and trawl

  • Project location:

    Moscow Region
SANY SCC 1000 crawler crane performed pile driving in Tula region

SANY SCC 1000 crawler crane performed pile driving in Tula region

  • Project location:

    Tula Oblast
Installation of a gas duct using a ZOOMLION ZCC 5800 crane in the Nizhny Novgorod region

Installation of a gas duct using a ZOOMLION ZCC 5800 crane in the Nizhny Novgorod region

  • Project location:

    Nizhny Novgorod Oblast
XCMG XGTC 130 tons crawler crane assembles bridge beams in Moscow

XCMG XGTC 130 tons crawler crane assembles bridge beams in Moscow

  • Project location:

    Krasnodar Krai
Installation of modern wind turbines in the southern part of Russia

Installation of modern wind turbines in the southern part of Russia

  • Project location:

    Krasnoyarsk Krai
Launch of the electric streetcar “Sinichka” with the help of a 500-ton Liebherr LTM 1500 truck crane

Launch of the electric streetcar “Sinichka” with the help of a 500-ton Liebherr LTM 1500 truck crane

  • Project location:

    Moscow
Participation in the construction of the main span of the pedestrian bridge between the Great Ring Road and the Tekstilshchiki metro station

Participation in the construction of the main span of the pedestrian bridge between the Great Ring Road and the Tekstilshchiki metro station

  • Project location:

    Moscow
GROSCRAN is loading a nuclear reactor element onto a ship.

GROSCRAN is loading a nuclear reactor element onto a ship.

  • Project location:

    Leningrad Oblast
GROSKRAN participates in the construction of a new office of Yandex

GROSKRAN participates in the construction of a new office of Yandex

  • Project location:

    Moscow
Groskran loads a power plant for water transportation on the Moskva River

Groskran loads a power plant for water transportation on the Moskva River

  • Project location:

    Moscow
Vestas wind turbine blade replacement. Liebherr LTM 1750 truck crane (750 tons)

Vestas wind turbine blade replacement. Liebherr LTM 1750 truck crane (750 tons)

  • Project location:

    Stavropol Krai
Construction of a new road from MKAD to the city center, with the participation of Liebherr LTM 1500 truck crane (500 tons)

Construction of a new road from MKAD to the city center, with the participation of Liebherr LTM 1500 truck crane (500 tons)

  • Project location:

    Moscow
Truck crane 500 tons carries out works on the territory of TC “VEGAS”

Truck crane 500 tons carries out works on the territory of TC “VEGAS”

  • Project location:

    Moscow
750-ton crawler crane installs crosswalk at Sheremetyevo Airport

750-ton crawler crane installs crosswalk at Sheremetyevo Airport

  • Project location:

    Moscow Region
Construction of the Moscow Metro

Construction of the Moscow Metro

  • Project location:

    Moscow
Installation of the LUKOIL Horizontal Profile Sectional Apparatus

Installation of the LUKOIL Horizontal Profile Sectional Apparatus

  • Project location:

    Volgograd Oblast
Wind generator assembly in Rostov-on-Don

Wind generator assembly in Rostov-on-Don

  • Project location:

    Rostov Oblast
Installation of a tank for a wood processing plant in Arkhangelsk

Installation of a tank for a wood processing plant in Arkhangelsk

  • Project location:

    Arkhangelsk Oblast
Transportation of a tunneling panel from Michurinsky Prospekt

Transportation of a tunneling panel from Michurinsky Prospekt

  • Project location:

    Moscow
Dismantling of the tunneling shield with two cranes

Dismantling of the tunneling shield with two cranes

  • Project location:

    Moscow
Transportation of the EPB 3600 Herrenknecht tunnel boring machine

Transportation of the EPB 3600 Herrenknecht tunnel boring machine

  • Project location:

    Moscow
Transportation of Liebherr LRB 255 pile driver from Obninsk to Moscow

Transportation of Liebherr LRB 255 pile driver from Obninsk to Moscow

  • Project location:

    Moscow Region
Grove 220 ton truck crane dismantles tower crane

Grove 220 ton truck crane dismantles tower crane

  • Project location:

    Moscow
Truck crane transportation 55 tons to Murmansk

Truck crane transportation 55 tons to Murmansk

  • Project location:

    Murmansk Oblast
Transportation of a transformer weighing 96 tons

Transportation of a transformer weighing 96 tons

  • Project location:

    Moscow
Transportation of coils by trawls for Mosmetrostroy Company

Transportation of coils by trawls for Mosmetrostroy Company

  • Project location:

    Moscow Region
Transportation of drilling machine Sany SR285RC10 weighing 92 tons

Transportation of drilling machine Sany SR285RC10 weighing 92 tons

  • Project location:

    Moscow
Installation of wind turbines in Stavropol Krai

Installation of wind turbines in Stavropol Krai

  • Project location:

    Stavropol Krai
Installation of autoclave furnace ring in Bryansk region

Installation of autoclave furnace ring in Bryansk region

  • Project location:

    Bryansk Oblast
Installation of a road element weighing 260 tons in Reutov

Installation of a road element weighing 260 tons in Reutov

  • Project location:

    Moscow Region
Dismantling of tunnel boring complex, Michurinsky Prospekt

Dismantling of tunnel boring complex, Michurinsky Prospekt

  • Project location:

    Moscow
Installation of a railway bridge, Fili district embankment

Installation of a railway bridge, Fili district embankment

  • Project location:

    Moscow
Installation of the TU-144 airplane monument in the city of Zhukovsky

Installation of the TU-144 airplane monument in the city of Zhukovsky

  • Project location:

    Moscow Region
Transportation of beams from Dmitrovsky plant to Belgorod

Transportation of beams from Dmitrovsky plant to Belgorod

  • Project location:

    Moscow
Transportation of truck crane Liebherr LTM 1350 Moscow - Murmansk

Transportation of truck crane Liebherr LTM 1350 Moscow - Murmansk

  • Project location:

    Moscow
Transportation of counter-loads for work of special-purpose machinery at the Yaroslavl Refinery

Transportation of counter-loads for work of special-purpose machinery at the Yaroslavl Refinery

  • Project location:

    Yaroslavl Oblast
Transportation of Liebherr LR 1350 crawler crane

Transportation of Liebherr LR 1350 crawler crane

  • Project location:

    Moscow
Installation of the cross on the dome of the monastery

Installation of the cross on the dome of the monastery

  • Project location:

    Moscow Region
Transportation of the Herrenknecht ERB 3600 tunnel boring machine

Transportation of the Herrenknecht ERB 3600 tunnel boring machine

  • Project location:

    Moscow
Transportation of truck crane SANY STC800 in Dmitrov city

Transportation of truck crane SANY STC800 in Dmitrov city

  • Project location:

    Moscow Region
Installation of overpass elements in Reutov

Installation of overpass elements in Reutov

  • Project location:

    Moscow Region
Loading a boat Kolomenskaya Floodplain

Loading a boat Kolomenskaya Floodplain

  • Project location:

    Moscow
Lifting the air conditioner to the roof of the building

Lifting the air conditioner to the roof of the building

  • Project location:

    Moscow
Kerch Bridge forwarder installation

Kerch Bridge forwarder installation

  • Project location:

    Republic of Crimea
Installation of a crossing at Krasnaya Presnya

Installation of a crossing at Krasnaya Presnya

  • Project location:

    Moscow
Bridge dismantling and transportation of girders on a low-bed flat bed

Bridge dismantling and transportation of girders on a low-bed flat bed

  • Project location:

    Moscow
Transportation of crawler cranes by the company's trawls

Transportation of crawler cranes by the company's trawls

  • Project location:

    Republic of Crimea
Crawler cranes on the “Crimean Bridge”, assembly and pile driving

Crawler cranes on the “Crimean Bridge”, assembly and pile driving

  • Project location:

    Republic of Crimea
Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River

Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River

  • Project location:

    Moscow
Installation of bridge spans with Liebherr truck crane

Installation of bridge spans with Liebherr truck crane

  • Project location:

    Rostov Oblast
Transportation of crawler crane 350 tons Liebherr LR 1350

Transportation of crawler crane 350 tons Liebherr LR 1350

  • Project location:

    Saint Petersburg
Installation of transmission towers for Balakovo Nuclear Power Plant

Installation of transmission towers for Balakovo Nuclear Power Plant

  • Project location:

    Saratov Oblast
Dismantling of tower cranes on the WHSD bridge in St. Petersburg

Dismantling of tower cranes on the WHSD bridge in St. Petersburg

  • Project location:

    Saint Petersburg
Installation of an air separation unit at the gas plant in Tula

Installation of an air separation unit at the gas plant in Tula

  • Project location:

    Tula Oblast
Installation of pavilions for the military-technical forum in the town of Kubinka

Installation of pavilions for the military-technical forum in the town of Kubinka

  • Project location:

    Moscow Region
Dismantling and transportation of Efes brewery barrels

Dismantling and transportation of Efes brewery barrels

  • Project location:

    Moscow
Transportation of military equipment in the All-Russian Exhibition Center “VDNKh”, preparation for May 9

Transportation of military equipment in the All-Russian Exhibition Center “VDNKh”, preparation for May 9

  • Project location:

    Moscow
Dismantling of a gantry crane at a reinforced concrete plant

Dismantling of a gantry crane at a reinforced concrete plant

  • Project location:

    Moscow Region
Installation of a boiler tube in a new neighborhood

Installation of a boiler tube in a new neighborhood

  • Project location:

    Moscow
Transportation and installation of transformer 180 tons

Transportation and installation of transformer 180 tons

  • Project location:

    Moscow Region
Installation of a crosswalk over the railroad line

Installation of a crosswalk over the railroad line

  • Project location:

    Moscow
Excavator transportation from Moscow to St. Petersburg

Excavator transportation from Moscow to St. Petersburg

  • Project location:

    Санкт-ПетербургМосква
Reactor transportation from Moscow to St. Petersburg

Reactor transportation from Moscow to St. Petersburg

  • Project location:

    МоскваСанкт-Петербург
Tank transportation

Tank transportation

  • Project location:

    Moscow Region
Transportation of Liebherr drilling rig

Transportation of Liebherr drilling rig

  • Project location:

    Saint Petersburg
Casagranda rig transportation

Casagranda rig transportation

  • Project location:

    Moscow
Transportation of machinery port Kasimovo - Kolomna

Transportation of machinery port Kasimovo - Kolomna

  • Project location:

    Ryazan Oblast
Loading and assembly of the yacht

Loading and assembly of the yacht

  • Project location:

    Moscow Region
Assembly of a part of the yacht

Assembly of a part of the yacht

  • Project location:

    Moscow
Installing the dome on the church. Charity

Installing the dome on the church. Charity

  • Project location:

    Moscow
Mounting of equipment with control gooseneck

Mounting of equipment with control gooseneck

  • Project location:

    Tula Oblast
Air conditioner installation in Moscow City Hall

Air conditioner installation in Moscow City Hall

  • Project location:

    Moscow
Unloading the Transformer

Unloading the Transformer

  • Project location:

    Moscow
Reactor loading and transportation 320 tons

Reactor loading and transportation 320 tons

  • Project location:

    Tula Oblast
Assistance with the construction of the residence

Assistance with the construction of the residence

  • Project location:

    Moscow
Help on the construction site with a gooseneck

Help on the construction site with a gooseneck

  • Project location:

    Moscow
Renaissance Construction

Renaissance Construction

  • Project location:

    Moscow
Dismantling of the tunneling shield

Dismantling of the tunneling shield

  • Project location:

    Moscow
Organization of jumping with a rubber band from a height of 100 m

Organization of jumping with a rubber band from a height of 100 m

  • Project location:

    Moscow
Oil refinery assembly

Oil refinery assembly

  • Project location:

    Moscow
Transportation of an oil column

Transportation of an oil column

  • Project location:

    Volgograd Oblast
Installation of a harbor crane

Installation of a harbor crane

  • Project location:

    Saint Petersburg
Installation of bridge girders

Installation of bridge girders

  • Project location:

    Tula Oblast
Installation of double-glazed windows in the Regional Duma building

Installation of double-glazed windows in the Regional Duma building

  • Project location:

    Moscow Region
Loading and unloading for transportation of the Buran spacecraft

Loading and unloading for transportation of the Buran spacecraft

  • Project location:

    Moscow
Installation of beams over 3 km

Installation of beams over 3 km

  • Project location:

    Moscow Region
Overpass in Lublino

Overpass in Lublino

  • Project location:

    Moscow
Contact us