back

Back

Oil refinery assembly

Competent work of the experienced crane operator allowed to install the oversized equipment precisely on the prepared site.

The crane used for the work was LTM1500. The weight of the load to be installed was 70 tons. The work was carried out accurately and in a short time.

/assets/images/resources/177/image-3ee31e5e2642948e3cdc1b70d54c781cb37cddb06e7a3a396db772d7ab93623e-v.jpg /assets/images/resources/177/image-6c02e1547edba0abd74cd36fb5874c5a0d6e4ac780a44fce776161eab5742c8e-v.jpg /assets/images/resources/177/image-45155aa00fb0dd3460baaa6e37c5a1abf52458ef9573557ac54a1e708c4af903-v.jpg /assets/images/resources/177/image-ccedab08800263f8793321bde0dfd989b4c67c8f6068d707afe0bc1895751cd3-v.jpg /assets/images/resources/177/image-d30c0da79c9b08485953dd569a869dae659a9902e674ede572465838cad50f29-v.jpg /assets/images/resources/177/image-f120f606208ff675e398eb2280c2557a2eaa4e9e6ba74b4c2fdb3ead6b332677-v.jpg
Other works
Dismantling and transportation of Efes brewery barrels
Dismantling and transportation of Efes brewery barrels
  • Project Location:

    Moscow
Read More
Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River
Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River
  • Project Location:

    Moscow
Read More
Overpass in Lublino
Overpass in Lublino
  • Project Location:

    Moscow
Read More
Contact us