Installing the dome on the church. Charity

The weight of the dome was 6.5 tons. Careful work helped to achieve success and accurately install the complex structure on the church.

During the restoration of the church, high-rise equipment was needed to install the dome. A LTM1070 crane with an operator was provided on a charitable basis.

/assets/images/resources/187/20150521-152007.jpg /assets/images/resources/187/20150521-152019.jpg /assets/images/resources/187/20150521-152040.jpg /assets/images/resources/187/20150521-152041.jpg /assets/images/resources/187/20150521-154555.jpg /assets/images/resources/187/image-bb919572bda870b417157200e301b8c442349c47d1808b6b9b472802b76d5769-v.jpg
Other works
Dismantling and transportation of Efes brewery barrels
Dismantling and transportation of Efes brewery barrels
  • Project Location:

    Moscow
Read More
Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River
Construction of Zaryadye Park in Moscow, installation of a stage over the Moskva River
  • Project Location:

    Moscow
Read More
Overpass in Lublino
Overpass in Lublino
  • Project Location:

    Moscow
Read More
Contact us