The large-scale operation began with the transportation of oversized equipment. Powerful Mercedes-Benz 4160 SLT 8x8 and MAN TGX 41.680 all-terrain trucks were used to transport the massive column, ensuring the cargo was delivered on time.

The key stage of the work was the installation of the column. For this, Groskran utilized a fleet of modern mobile and crawler cranes from the world leader, Liebherr. The following were used on site:

Two truck cranes: a Liebherr LTM 1350-6.1 with a lifting capacity of 350 tons and a Liebherr LTM 1250-6.1 with a lifting capacity of 250 tons. This equipment ensured precise unloading and pre-installation preparation of the equipment.

· A Liebherr LR 1750 crawler crane with a lifting capacity of 750 tonnes, which carried out the final lifting and precise installation of the column at the design location.